Back to all work
Technical posters

- Client
- PETRONAS, through Vision Petroleum
- Year
- 2015–2019
- Role
- Data visualisation, infographics and schematic drawing
The challenge
Engineering teams had the data in spreadsheets and reports. Managers needed to see the whole programme — fields, phases, gains — in the time it takes to walk past a wall.
What I did
I treated each poster like a map: one reading path, a clear hierarchy of numbers, and colour used only to separate what is planned from what is achieved.
Schematics and plans were redrawn from engineering drawings so they could be read by people who don't read engineering drawings.
CACTUS Water Injection — surface roadmap

Water injection

Subsurface Asset Management (SSM) charter

Seawater injection — reservoir management

Malaysia gas-lifted fields assessment

Marvellous Raya 2015

Schematic drawing

Technical report — certificate

Schematic drawing, second set

Master plan

Water treatment

Work standard

The result
The CACTUS roadmap put a RM 540 million water-injection target on one wall.
- posters and drawings
- 12posters and drawings
- target visualised on the CACTUS roadmap
- RM 540Jtarget visualised on the CACTUS roadmap
- oil fields mapped on one timeline
- 9oil fields mapped on one timeline
Want something like this for your team?
Pick a time for a free 30-minute call, or send a short brief and I'll reply within one working day.
